- =?UTF-8?Q?=5B22_1249452=5DBCN20223177_=2D_Code_Compliance_=E2=80=93_Engineers_Si?= =?UTF-8?Q?te_Reports_=2D_2022=2D09=2D13=2EMSG?=
- =?UTF-8?Q?=5B22_1296569=5DBCN20223177_=2D_Code_Compliance_=E2=80=93_Engineers_Si?= =?UTF-8?Q?te_Reports_=2D_2022=2D09=2D21=2EMSG?=
- =?UTF-8?Q?=5B22_929042=5DBCN20223177_=2D_Processing_=E2=80=93_Building_=2D_RFI_1_=2D?= =?UTF-8?Q?_Request=2EMSG?=
- [10 386955] 34 Frederick Street Waltham Scanned Documents.PDF
- [10 386957]124 34 Frederick Street Waltham Scanned Documents.PDF
- [10 386959]418 34 Frederick Street Waltham Scanned Documents.PDF
- [10 459399]LIM70119832 Report Final.PDF
- [13 465611]ABA10058715 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 465612]642 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 465613]LIM70015578 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 465618]LIM70031678 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 465620]LIM70034566 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 465623]LIM70046558 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 470919]CON93005122 32 FREDERICK STREET WALTHAM Scanned Documents.PDF
- [13 486360]LIM70145748 Application.PDF
- [13 486370]Attached - .msg
- [15 285825]LIM70168625 Report.PDF
- [21 1411256]RMA20213357 Application Original - Land Use Consent - 28 Frederick Street.PDF
- [21 1617783]RMA20213357 Email to Agent - RFI (181121).MSG
- [21 1688392]RMA20213357 Email from Agent - partial RFI response 21221.MSG
- [21 1688397]RMA20213357 Email from Agent - partial RFI #2 response 21221.MSG
- [21 1691014]RMA20213357 Email from Agent - vehicle tracking - RFI Complete (21221).MSG
- [21 1699525]RMA20213357 Engineering - Geotechnical - 28-34 Frederick St RFI.MSG
- [21 1711410]RMA20213357 Approved Consent Plans.PDF
- [21 1808388]RMA20213357 Combined s95104 Report.PDF
- [21 1808487]RMA20213357 Decision Email.MSG
- [21 726769]LIM70246746 - Report.PDF
- [22 1021642]ADD20226362 - Processing - RFI Response - Letter.PDF
- [22 1021644]ADD20226362 - Processing - RFI Response - Plans.PDF
- [22 1021646]ADD20226362 - Processing - RFI Response - Supporting Documents.PDF
- [22 1021647]ADD20226362 - Processing - RFI Response - Supporting Documents.PDF
- [22 1021649]ADD20226362 - Processing - RFI Response - Letter.PDF
- [22 1021651]ADD20226362 - Processing - RFI Response - Supporting Documents.PDF
- [22 1021671]BCN20223177 - Email to BCO.MSG
- [22 1032870]BCN20223177 - Processing - Building - Fire Report.MSG
- [22 1036265]BCN20223177 - Section 77 certificate (Matter 2204920).MSG
- [22 1057483]BCN20223177 - Internal communication - Geotech handover - S. Karmacharya.MSG
- [22 1059521]BCN20223177 - Processing Geotech review complete.MSG
- [22 1074829]BCN20223177 - Processing - 3 Waters RFI - Review of proposed stormwater and wastewater network connections - Updated Plans.MSG
- [22 1074840]BCN20223177 - Processing - CCC Engineering Acceptance - Stormwater and Wastewater Network Connections - Notification.MSG
- [22 1076265]BCN20223177 - Consent - Inspections.DOCX
- [22 1076467]BCN20223177 - Consent - Section 51.DOCX
- [22 1088438]BCN20223177 - Processing - Tasks and Fees - B-103.XLSM
- [22 1089639]BCN20223177 - Consent - Conditions.DOCX
- [22 1089797]BCN20223177 - Consent - Inspections - APPROVED.PDF
- [22 1089801]BCN20223177 - Consent - Conditions - APPROVED.PDF
- [22 1089802]BCN20223177 - Consent - Section 51.PDF
- [22 1089808]BCN20223177 - Ground Report.PDF
- [22 1089832]BCN20223177 - Ground Report - Email.MSG
- [22 1089844]BCN20223177 - Rates Copy - 2255058100 2255058200 & 2255058300 - Email.MSG
- [22 1090527]BCN20223177 - Invoice Breakdown.PDF
- [22 1090542]BCN20223177 - Invoice with cover letter - consent granted.DOCX
- [22 1090586]BCN20223177 - Invoice with cover letter - consent granted.PDF
- [22 1092288]BCN20223177 - Processing - Wastewater Capacity - Advice Note - Review - 28 32 and 34 Frederick Street Linwood.MSG
- [22 1094044]BCN20223177 - Building consent issued.DOCX
- [22 1094057]BCN20223177 - Building consent issued.PDF
- [22 1094062]BCN20223177 - Building Consent - PS4 - Email.MSG
- [22 1124072]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - 2022-08-22 - Pass.pdf.PDF
- [22 1124076]BCN20223177 - Inspection - Site Notice - 2022-08-22.pdf.PDF
- [22 1225445]BCN20223177 - Code Compliance - Building Location Certificate - B-081 - 2022-09-08.MSG
- [22 1233916]Fwd Frederick St Block B NDM report - FINAL LAYER NEEDED.MSG
- [22 1233972]RE Frederick St Block B NDM report.MSG
- [22 1234006]Fwd Frederick St Block B NDM report.MSG
- [22 1234043]28 Frederick Street- Water test block a and b as3500.MSG
- [22 1234134]BCN20223177 - Inspection - 251 - Foundation or Slab - 2022-09-09 - Fail.pdf.PDF
- [22 1234137]BCN20223177 - Inspection - Site Notice - 2022-09-09.pdf.PDF
- [22 1234141]BCN20223177 - Code Compliance - pre pour block A and B - Frederick St Townhouses.MSG
- [22 1257569]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 1 (Block A Unit 1) - 2022-09-14 - Pass.pdf.PDF
- [22 1257572]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 2 (Block A Unit 2) - 2022-09-14 - Pass.pdf.PDF
- [22 1257573]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 3 (Block A Unit 3) - 2022-09-14 - Pass.pdf.PDF
- [22 1257574]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 4 (Block A Unit 4) - 2022-09-14 - Pass.pdf.PDF
- [22 1257575]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 5 (Block A Unit 5) - 2022-09-14 - Pass.pdf.PDF
- [22 1257576]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 6 (Block B Unit 6) - 2022-09-14 - Pass.pdf.PDF
- [22 1257579]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 7 (Block B Unit 7) - 2022-09-14 - Pass.pdf.PDF
- [22 1257580]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 8 (Block BUnit 8) - 2022-09-14 - Pass.pdf.PDF
- [22 1257581]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 9 (Block B Unit 9) - 2022-09-14 - Pass.pdf.PDF
- [22 1257584]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 10 (Block C Unit 10) - 2022-09-14 - Pass.pdf.PDF
- [22 1257585]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 11 (Block C Unit 11) - 2022-09-14 - Pass.pdf.PDF
- [22 1257586]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 12 (Block C Unit 12) - 2022-09-14 - Pass.pdf.PDF
- [22 1257587]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 13 (Block C Unit 13) - 2022-09-14 - Pass.pdf.PDF
- [22 1257588]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 14 (Block C Unit 14) - 2022-09-14 - Pass.pdf.PDF
- [22 1257589]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 15 (Block D Unit 15) - 2022-09-14 - Pass.pdf.PDF
- [22 1257592]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 17 (Block D Unit 17) - 2022-09-14 - Pass.pdf.PDF
- [22 1257593]BCN20223177 - Inspection - 255 - Erosion and Sediment Control - Unit 18 (Block D Unit 18) - 2022-09-14 - Pass.pdf.PDF
- [22 1257597]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 1 (Block A Unit 1) - 2022-09-14 - Fail.pdf.PDF
- [22 1257600]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 2 (Block A Unit 2) - 2022-09-14 - Fail.pdf.PDF
- [22 1257602]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 4 (Block A Unit 4) - 2022-09-14 - Fail.pdf.PDF
- [22 1257604]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 5 (Block A Unit 5) - 2022-09-14 - Fail.pdf.PDF
- [22 1257605]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 6 (Block B Unit 6) - 2022-09-14 - Fail.pdf.PDF
- [22 1257606]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 7 (Block B Unit 7) - 2022-09-14 - Fail.pdf.PDF
- [22 1257608]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 9 (Block B Unit 9) - 2022-09-14 - Fail.pdf.PDF
- [22 1257610]BCN20223177 - Inspection - Site Notice - 2022-09-14.pdf.PDF
- [22 1272778]BCN20223177 - Code Compliance - Building Location Certificate - B-081 - Blocks C and D - 2022-09-16.MSG
- [22 1297317]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 10 (Block C Unit 10) - 2022-09-21 - Fail.pdf.PDF
- [22 1297318]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 11 (Block C Unit 11) - 2022-09-21 - Fail.pdf.PDF
- [22 1297319]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 12 (Block C Unit 12) - 2022-09-21 - Fail.pdf.PDF
- [22 1297321]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 14 (Block C Unit 14) - 2022-09-21 - Fail.pdf.PDF
- [22 1297322]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 15 (Block D Unit 15) - 2022-09-21 - Fail.pdf.PDF
- [22 1297323]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 16 (Block D Unit 16) - 2022-09-21 - Fail.pdf.PDF
- [22 1297324]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 17 (Block D Unit 17) - 2022-09-21 - Fail.pdf.PDF
- [22 1297325]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 18 (Block D Unit 18) - 2022-09-21 - Fail.pdf.PDF
- [22 1297326]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 19 (Block D Unit 19) - 2022-09-21 - Fail.pdf.PDF
- [22 1297328]BCN20223177 - Inspection - Site Notice - 2022-09-21.pdf.PDF
- [22 1308414]RE 28 Frederick St remaining report email confirming GUBC and all works complete.MSG
- [22 1403937]BCN20223177 - Inspection - 252 - Drainage - Unit 1 (Block A Unit 1) - 2022-10-11 - Fail.pdf.PDF
- [22 1403938]BCN20223177 - Inspection - 252 - Drainage - Unit 2 (Block A Unit 2) - 2022-10-11 - Fail.pdf.PDF
- [22 1403939]BCN20223177 - Inspection - 252 - Drainage - Unit 3 (Block A Unit 3) - 2022-10-11 - Fail.pdf.PDF
- [22 1403940]BCN20223177 - Inspection - 252 - Drainage - Unit 4 (Block A Unit 4) - 2022-10-11 - Fail.pdf.PDF
- [22 1403942]BCN20223177 - Inspection - 252 - Drainage - Unit 6 (Block B Unit 6) - 2022-10-11 - Fail.pdf.PDF
- [22 1403944]BCN20223177 - Inspection - 252 - Drainage - Unit 7 (Block B Unit 7) - 2022-10-11 - Fail.pdf.PDF
- [22 1403946]BCN20223177 - Inspection - 252 - Drainage - Unit 9 (Block B Unit 9) - 2022-10-11 - Fail.pdf.PDF
- [22 1403950]BCN20223177 - Inspection - 252 - Drainage - Unit 11 (Block C Unit 11) - 2022-10-11 - Fail.pdf.PDF
- [22 1403952]BCN20223177 - Inspection - 252 - Drainage - Unit 13 (Block C Unit 13) - 2022-10-11 - Fail.pdf.PDF
- [22 1403954]BCN20223177 - Inspection - 252 - Drainage - Unit 15 (Block D Unit 15) - 2022-10-11 - Fail.pdf.PDF
- [22 1403958]BCN20223177 - Inspection - 252 - Drainage - Unit 17 (Block D Unit 17) - 2022-10-11 - Fail.pdf.PDF
- [22 1403960]BCN20223177 - Inspection - 252 - Drainage - Unit 18 (Block D Unit 18) - 2022-10-11 - Fail.pdf.PDF
- [22 1403962]BCN20223177 - Inspection - 252 - Drainage - Unit 19 (Block D Unit 19) - 2022-10-11 - Fail.pdf.PDF
- [22 1418667]BCN20223177 - Code Compliance - As Built Truss Plan - 2022-10-13.MSG
- [22 1460651]BCN20223177 - Inspection - 252 - Drainage - Unit 6 (Block B Unit 6) - 2022-10-20 - Fail.pdf.PDF
- [22 1460652]BCN20223177 - Inspection - 252 - Drainage - Unit 7 (Block B Unit 7) - 2022-10-20 - Fail.pdf.PDF
- [22 1460655]BCN20223177 - Inspection - 252 - Drainage - Unit 10 (Block C Unit 10) - 2022-10-20 - Fail.pdf.PDF
- [22 1460656]BCN20223177 - Inspection - 252 - Drainage - Unit 11 (Block C Unit 11) - 2022-10-20 - Fail.pdf.PDF
- [22 1460658]BCN20223177 - Inspection - 252 - Drainage - Unit 13 (Block C Unit 13) - 2022-10-20 - Fail.pdf.PDF
- [22 1460659]BCN20223177 - Inspection - 252 - Drainage - Unit 14 (Block C Unit 14) - 2022-10-20 - Fail.pdf.PDF
- [22 1460660]BCN20223177 - Inspection - Site Notice - 2022-10-20.pdf.PDF
- [22 1473437]BCN20223177 - Code Compliance - As-built Truss Plan - Block B - 2022-10-25.MSG
- [22 1473830]BCN20223177 - Code Compliance - As-built Truss Plan - Block C - 2022-10-25.MSG
- [22 1513177]BCN20223177 - Inspection - 252 - Drainage - Unit 1 (Block A Unit 1) - 2022-11-01 - Fail.pdf.PDF
- [22 1513178]BCN20223177 - Inspection - 252 - Drainage - Unit 2 (Block A Unit 2) - 2022-11-01 - Fail.pdf.PDF
- [22 1513180]BCN20223177 - Inspection - 252 - Drainage - Unit 3 (Block A Unit 3) - 2022-11-01 - Fail.pdf.PDF
- [22 1513181]BCN20223177 - Inspection - 252 - Drainage - Unit 4 (Block A Unit 4) - 2022-11-01 - Fail.pdf.PDF
- [22 1513182]BCN20223177 - Inspection - 252 - Drainage - Unit 5 (Block A Unit 5) - 2022-11-01 - Fail.pdf.PDF
- [22 1513184]BCN20223177 - Inspection - 252 - Drainage - Unit 7 (Block B Unit 7) - 2022-11-01 - Fail.pdf.PDF
- [22 1513185]BCN20223177 - Inspection - 252 - Drainage - Unit 8 (Block BUnit 8) - 2022-11-01 - Fail.pdf.PDF
- [22 1513187]BCN20223177 - Inspection - 252 - Drainage - Unit 9 (Block B Unit 9) - 2022-11-01 - Fail.pdf.PDF
- [22 1513189]BCN20223177 - Inspection - 252 - Drainage - Unit 11 (Block C Unit 11) - 2022-11-01 - Fail.pdf.PDF
- [22 1513191]BCN20223177 - Inspection - 252 - Drainage - Unit 12 (Block C Unit 12) - 2022-11-01 - Fail.pdf.PDF
- [22 1513193]BCN20223177 - Inspection - 252 - Drainage - Unit 13 (Block C Unit 13) - 2022-11-01 - Fail.pdf.PDF
- [22 1513194]BCN20223177 - Inspection - 252 - Drainage - Unit 14 (Block C Unit 14) - 2022-11-01 - Fail.pdf.PDF
- [22 1513196]BCN20223177 - Inspection - 252 - Drainage - Unit 16 (Block D Unit 16) - 2022-11-01 - Fail.pdf.PDF
- [22 1513199]BCN20223177 - Inspection - 252 - Drainage - Unit 18 (Block D Unit 18) - 2022-11-01 - Fail.pdf.PDF
- [22 1513201]BCN20223177 - Inspection - Site Notice - 2022-11-01.pdf.PDF
- [22 1625753]BCN20223177 - Water Connection upgrade As Built sent for plotting - email.MSG
- [22 244048]LIMH00885360 - Report.PDF
- [22 630548]BCN20223177 - Application Original - Building Consent - SUPERSEDED by 22639823.PDF
- [22 630586]BCN20223177 - Application Original - Plans.PDF
- [22 630599]BCN20223177 - Application Original - Specifications.PDF
- [22 630604]BCN20223177 - Application Original - Structural supporting docs.PDF
- [22 630615]BCN20223177 - Application Original - Other supporting documents.PDF
- [22 638876]BCN20223177 - Vetting - RFI - Email.MSG
- [22 638896]BCN20223177 - Vetting - RFI - Forward to owner - Email.MSG
- [22 639663]BCN20223177 - Vetting - RFI response - Email.MSG
- [22 639672]BCN20223177 - Vetting - RFI response - Email.MSG
- [22 639684]BCN20223177 - Proof of ownership - S&P - 28 Frederick Street.PDF
- [22 639688]BCN20223177 - Application Original - Building Consent - SUPERSEDED by 22639823.PDF
- [22 639799]BCN20223177 - Vetting - RFI response - Email.MSG
- [22 639823]BCN20223177 - Application Original - Building Consent.PDF
- [22 640153]BCN20223177 - Application - Certificate of Title x3.PDF
- [22 640246]BCN20223177 - Water connection application - Email.MSG
- [22 640643]BCN20223177 - Consent - Plans - APPROVED.PDF
- [22 640655]BCN20223177 - Consent - Specifications - APPROVED.PDF
- [22 640728]BCN20223177 - Processing - Checksheet - B-100R.XLSM
- [22 640736]BCN20223177 - Vetting - RFI - Email.MSG
- [22 642902]BCN20223177 - Vetting - RFI response - Email.MSG
- [22 643003]BCN20223177 - Property information from GIS.PDF
- [22 643013]BCN20223177 - Project Information Memorandum.DOCX
- [22 643019]BCN20223177 - PIM - Drainage Plan - As at 2022-05-18.PDF
- [22 643052]BCN20223177 - Application accepted with deposit invoice.DOCX
- [22 653593]BCN20223177 - Section 36 Certificate - Dev Contributions Notice (SUPERSEDED).DOCX
- [22 656295]BCN20223177 - Deposit Invoice - 15 day terms.DOCX
- [22 656369]BCN20223177 - Deposit Invoice.PDF
- [22 656377]BCN20223177 - Application Accepted with Deposit Invoice.PDF
- [22 656387]BCN20223177 - Application accepted with deposit invoice - Email.MSG
- [22 678383]BCN20223177 - Section 37 Certificate.DOCX
- [22 684941]BCN20223177 - PIM - Section 36 (SUPERSEDED).PDF
- [22 684942]BCN20223177 - PIM - Section 37.PDF
- [22 684945]BCN20223177 - Project Information Memorandum - APPROVED.PDF
- [22 685034]BCN20223177 - PIM APPROVED with Section 36 and Section 37 - Email.MSG
- [22 699613]BCN20223177 - Request for WW Engineering Acceptance Review.MSG
- [22 736063]BCN20223177 - Processing - Stormwater Discharge Approval - Advice Note - Review Complete.DOCX
- [22 748419]BCN20223177 - Processing - Stormwater Discharge Approval - Advice Note - Review Complete.MSG
- [22 793711]BCN20223177 - Processing - Geotechnical RFI.MSG
- [22 916668]BCN20223177 - Processing - Review of proposed stormwater and wastewater network connections.MSG
- [22 916673]BCN20223177 - Processing - 3 Waters RFI - Review of proposed stormwater and wastewater network connections.MSG
- [22 919823]BCN20223177 - Processing - CT Required - Internal Communication - BCO to Vetting.MSG
- [22 920292]BCN20223177 - Certificate of title.PDF
- [22 920929]BCN20223177 - Processing - Request for Registration of Section 77(1) Building Act 2004 Certificate.DOC
- [22 924364]BCN20223177 - Processing - Review of proposed Stormwater Approval and wastewater network connections - 3 Waters RFI.MSG
- [22 925219]BCN20223177 - Section 77 certificate (Matter 2204920).MSG
- [22 931507]BCN20223177 - Section 77 certificate (Matter 2204920) - Signed.MSG
- [22 931556]BCN20223177 - Section 77 certificate (Matter 2204920) - External Communication - BCO to AL.MSG
- [23 1080648]BCN20223177 - Inspection - 252 - Drainage - Unit 1 (Block A Unit 1) - 2023-07-10 - Pass.pdf.PDF
- [23 1080649]BCN20223177 - Inspection - 252 - Drainage - Unit 2 (Block A Unit 2) - 2023-07-10 - Pass.pdf.PDF
- [23 1080651]BCN20223177 - Inspection - 252 - Drainage - Unit 3 (Block A Unit 3) - 2023-07-10 - Pass.pdf.PDF
- [23 1080653]BCN20223177 - Inspection - 252 - Drainage - Unit 4 (Block A Unit 4) - 2023-07-10 - Pass.pdf.PDF
- [23 1080655]BCN20223177 - Inspection - 252 - Drainage - Unit 6 (Block B Unit 6) - 2023-07-10 - Pass.pdf.PDF
- [23 1080656]BCN20223177 - Inspection - 252 - Drainage - Unit 7 (Block B Unit 7) - 2023-07-10 - Pass.pdf.PDF
- [23 1080658]BCN20223177 - Inspection - 252 - Drainage - Unit 8 (Block B Unit 8) - 2023-07-10 - Pass.pdf.PDF
- [23 1080660]BCN20223177 - Inspection - 252 - Drainage - Unit 10 (Block C Unit 10) - 2023-07-10 - Pass.pdf.PDF
- [23 1080661]BCN20223177 - Inspection - 252 - Drainage - Unit 11 (Block C Unit 11) - 2023-07-10 - Pass.pdf.PDF
- [23 1080663]BCN20223177 - Inspection - 252 - Drainage - Unit 13 (Block C Unit 13) - 2023-07-10 - Pass.pdf.PDF
- [23 1080665]BCN20223177 - Inspection - 252 - Drainage - Unit 15 (Block D Unit 15) - 2023-07-10 - Pass.pdf.PDF
- [23 1080666]BCN20223177 - Inspection - 252 - Drainage - Unit 16 (Block D Unit 16) - 2023-07-10 - Pass.pdf.PDF
- [23 1080667]BCN20223177 - Inspection - 252 - Drainage - Unit 17 (Block D Unit 17) - 2023-07-10 - Pass.pdf.PDF
- [23 1080670]BCN20223177 - Inspection - 252 - Drainage - Unit 19 (Block D Unit 19) - 2023-07-10 - Pass.pdf.PDF
- [23 1080671]BCN20223177 - Inspection - Site Notice - 2023-07-10.pdf.PDF
- [23 1155017]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 1 (Block A Unit 1) - 2023-07-22 - Pass.pdf.PDF
- [23 1155018]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 2 (Block A Unit 2) - 2023-07-22 - Pass.pdf.PDF
- [23 1155019]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 3 (Block A Unit 3) - 2023-07-22 - Pass.pdf.PDF
- [23 1155020]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 4 (Block A Unit 4) - 2023-07-22 - Pass.pdf.PDF
- [23 1155023]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 6 (Block B Unit 6) - 2023-07-22 - Pass.pdf.PDF
- [23 1155024]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 7 (Block B Unit 7) - 2023-07-22 - Pass.pdf.PDF
- [23 1155025]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 8 (Block B Unit 8) - 2023-07-22 - Pass.pdf.PDF
- [23 1155026]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 9 (Block B Unit 9) - 2023-07-22 - Pass.pdf.PDF
- [23 1155027]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 10 (Block C Unit 10) - 2023-07-22 - Pass.pdf.PDF
- [23 1155028]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 11 (Block C Unit 11) - 2023-07-22 - Pass.pdf.PDF
- [23 1155030]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 13 (Block C Unit 13) - 2023-07-22 - Pass.pdf.PDF
- [23 1155032]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 15 (Block D Unit 15) - 2023-07-22 - Pass.pdf.PDF
- [23 1155033]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 16 (Block D Unit 16) - 2023-07-22 - Pass.pdf.PDF
- [23 1155034]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 17 (Block D Unit 17) - 2023-07-22 - Pass.pdf.PDF
- [23 1155035]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 18 (Block D Unit 18) - 2023-07-22 - Pass.pdf.PDF
- [23 1155036]BCN20223177 - Inspection - 216 - Interior Tanking (Pre Tile Tanking) - Unit 19 (Block D Unit 19) - 2023-07-22 - Pass.pdf.PDF
- [23 1244577]BCN20223177 - Inspection - 210 - Residential - Final - Unit 1 (Block A Unit 1) - 2023-08-07 - Fail.pdf.PDF
- [23 1244580]BCN20223177 - Inspection - 210 - Residential - Final - Unit 2 (Block A Unit 2) - 2023-08-07 - Fail.pdf.PDF
- [23 1244581]BCN20223177 - Inspection - 210 - Residential - Final - Unit 3 (Block A Unit 3) - 2023-08-07 - Fail.pdf.PDF
- [23 1244583]BCN20223177 - Inspection - 210 - Residential - Final - Unit 4 (Block A Unit 4) - 2023-08-07 - Fail.pdf.PDF
- [23 1244585]BCN20223177 - Inspection - 210 - Residential - Final - Unit 6 (Block B Unit 6) - 2023-08-07 - Fail.pdf.PDF
- [23 1244587]BCN20223177 - Inspection - 210 - Residential - Final - Unit 7 (Block B Unit 7) - 2023-08-07 - Fail.pdf.PDF
- [23 1244588]BCN20223177 - Inspection - 210 - Residential - Final - Unit 8 (Block BUnit 8) - 2023-08-07 - Fail.pdf.PDF
- [23 1244595]BCN20223177 - Inspection - Site Notice - 2023-08-07.pdf.PDF
- [23 124876]BCN20223177 - Inspection - 217 - Pre Roof - Unit 2 (Block A Unit 2) - Upper roof only - 2023-01-30 - Clear.pdf.PDF
- [23 124878]BCN20223177 - Inspection - 217 - Pre Roof - Unit 4 (Block A Unit 4) - Upper roof only - 2023-01-30 - Clear.pdf.PDF
- [23 124880]BCN20223177 - Inspection - 217 - Pre Roof - Unit 6 (Block B Unit 6) - Upper roof only - 2023-01-30 - Clear.pdf.PDF
- [23 124881]BCN20223177 - Inspection - 217 - Pre Roof - Unit 7 (Block B Unit 7) - Upper roof only - 2023-01-30 - Clear.pdf.PDF
- [23 124882]BCN20223177 - Inspection - 217 - Pre Roof - Unit 8 (Block BUnit 8) - Upper roof only - 2023-01-30 - Clear.pdf.PDF
- [23 124883]BCN20223177 - Inspection - 217 - Pre Roof - Unit 9 (Block B Unit 9) - Upper roof only - 2023-01-30 - Clear.pdf.PDF
- [23 1290107]BCN20223177 - Inspection - 210 - Residential - Final - Unit 1 (Block A Unit 1) - 2023-08-14 - Pass.pdf.PDF
- [23 1290109]BCN20223177 - Inspection - 210 - Residential - Final - Unit 5 (Block A Unit 5) - 2023-08-14 - Pass.pdf.PDF
- [23 306600]BCN20223177 - Inspection - 217 - Pre Roof - Unit 10 (Block C Unit 10) - 2023-03-03 - Pass.pdf.PDF
- [23 306601]BCN20223177 - Inspection - 217 - Pre Roof - Unit 11 (Block C Unit 11) - 2023-03-03 - Pass.pdf.PDF
- [23 306602]BCN20223177 - Inspection - 217 - Pre Roof - Unit 12 (Block C Unit 12) - 2023-03-03 - Pass.pdf.PDF
- [23 306603]BCN20223177 - Inspection - 217 - Pre Roof - Unit 13 (Block C Unit 13) - 2023-03-03 - Pass.pdf.PDF
- [23 306604]BCN20223177 - Inspection - 217 - Pre Roof - Unit 14 (Block C Unit 14) - 2023-03-03 - Pass.pdf.PDF
- [23 306605]BCN20223177 - Inspection - 217 - Pre Roof - Unit 15 (Block D Unit 15) - 2023-03-03 - Pass.pdf.PDF
- [23 306606]BCN20223177 - Inspection - 217 - Pre Roof - Unit 16 (Block D Unit 16) - 2023-03-03 - Pass.pdf.PDF
- [23 306609]BCN20223177 - Inspection - 217 - Pre Roof - Unit 19 (Block D Unit 19) - 2023-03-03 - Pass.pdf.PDF
- [23 334766]BCN20223177 - Code Compliance - Building Location Certificate - B-081 - 2023-03-08.MSG
- [23 371333]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 1 (Block A Unit 1) - Loxo - 2023-03-15 - Clear.pdf.PDF
- [23 371336]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 3 (Block A Unit 3) - Loxo - 2023-03-15 - Clear.pdf.PDF
- [23 371337]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 4 (Block A Unit 4) - Loxo - 2023-03-15 - Clear.pdf.PDF
- [23 371338]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 5 (Block A Unit 5) - Loxo - 2023-03-15 - Clear.pdf.PDF
- [23 371341]BCN20223177 - Inspection - Site Notice - 2023-03-15.pdf.PDF
- [23 425303]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 7 (Block B Unit 7) - 2023-03-23 - Pass.pdf.PDF
- [23 425313]BCN20223177 - Inspection - Site Notice - 2023-03-23.pdf.PDF
- [23 458307]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 1 (Block A Unit 1) - 2023-03-29 - Pass.pdf.PDF
- [23 458309]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 2 (Block A Unit 2) - 2023-03-29 - Pass.pdf.PDF
- [23 458312]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 4 (Block A Unit 4) - 2023-03-29 - Pass.pdf.PDF
- [23 458314]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 5 (Block A Unit 5) - 2023-03-29 - Pass.pdf.PDF
- [23 458316]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 1 (Block A Unit 1) - 2023-03-29 - Fail.pdf.PDF
- [23 458320]BCN20223177 - Inspection - Site Notice - 2023-03-29.pdf.PDF
- [23 466955]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 2 (Block A Unit 2) - Kahu - 2023-03-30 - Pass.pdf.PDF
- [23 466956]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 3 (Block A Unit 3) - Kahu - 2023-03-30 - Pass.pdf.PDF
- [23 466957]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 4 (Block A Unit 4) - Kahu - 2023-03-30 - Pass.pdf.PDF
- [23 466958]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 5 (Block A Unit 5) - Kahu - 2023-03-30 - Pass.pdf.PDF
- [23 466959]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 1 (Block A Unit 1) - 2023-03-30 - Pass.pdf.PDF
- [23 466960]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 2 (Block A Unit 2) - 2023-03-30 - Pass.pdf.PDF
- [23 466961]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 3 (Block A Unit 3) - 2023-03-30 - Pass.pdf.PDF
- [23 466965]BCN20223177 - Inspection - Site Notice - 2023-03-30.pdf.PDF
- [23 466968]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 2 (Block A Unit 2) - 2023-03-30 - Pass.pdf.PDF
- [23 466970]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 4 (Block A Unit 4) - 2023-03-30 - Pass.pdf.PDF
- [23 466972]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 6 (Block B Unit 6) - 2023-03-30 - Pass.pdf.PDF
- [23 466974]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 8 (Block BUnit 8) - 2023-03-30 - Pass.pdf.PDF
- [23 466976]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 10 (Block C Unit 10) - 2023-03-30 - Pass.pdf.PDF
- [23 466978]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 12 (Block C Unit 12) - 2023-03-30 - Pass.pdf.PDF
- [23 466980]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 14 (Block C Unit 14) - 2023-03-30 - Pass.pdf.PDF
- [23 466982]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 16 (Block D Unit 16) - 2023-03-30 - Pass.pdf.PDF
- [23 466984]BCN20223177 - Inspection - 251 - Foundation or Slab - Unit 18 (Block D Unit 18) - 2023-03-30 - Pass.pdf.PDF
- [23 480958]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 10 (Block C Unit 10) - 2023-04-03 - Fail.pdf.PDF
- [23 480962]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 12 (Block C Unit 12) - 2023-04-03 - Fail.pdf.PDF
- [23 480964]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 14 (Block C Unit 14) - 2023-04-03 - Fail.pdf.PDF
- [23 480966]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 6 (Block B Unit 6) - Metal cladding top - 2023-04-03 - Fail.pdf.PDF
- [23 480968]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 7 (Block B Unit 7) - Metal cladding top - 2023-04-03 - Fail.pdf.PDF
- [23 480970]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 8 (Block BUnit 8) - Metal cladding top - 2023-04-03 - Fail.pdf.PDF
- [23 480972]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 6 (Block B Unit 6) - 2023-04-03 - Fail.pdf.PDF
- [23 480973]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 7 (Block B Unit 7) - 2023-04-03 - Fail.pdf.PDF
- [23 480976]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 9 (Block B Unit 9) - 2023-04-03 - Fail.pdf.PDF
- [23 480979]BCN20223177 - Inspection - Site Notice - 2023-04-03.pdf.PDF
- [23 505805]BCN20223177 - Inspection - 217 - Pre Roof - Unit 1 (Block A Unit 1) - Upper roof only - 2023-04-06 - Pass.pdf.PDF
- [23 505806]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 15 (Block D Unit 15) - 2023-04-06 - Pass.pdf.PDF
- [23 505808]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 17 (Block D Unit 17) - 2023-04-06 - Pass.pdf.PDF
- [23 505811]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 19 (Block D Unit 19) - 2023-04-06 - Pass.pdf.PDF
- [23 505812]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 6 (Block B Unit 6) - 2023-04-06 - Pass.pdf.PDF
- [23 505813]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 7 (Block B Unit 7) - 2023-04-06 - Pass.pdf.PDF
- [23 505814]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 8 (Block B Unit 8) - 2023-04-06 - Pass.pdf.PDF
- [23 505815]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 9 (Block B Unit 9) - 2023-04-06 - Pass.pdf.PDF
- [23 540259]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 10 (Block C Unit 10) - 2023-04-14 - Pass.pdf.PDF
- [23 540261]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 12 (Block C Unit 12) - 2023-04-14 - Pass.pdf.PDF
- [23 540265]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 6 (Block B Unit 6) - Metal cladding top - 2023-04-14 - Pass.pdf.PDF
- [23 540266]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 7 (Block B Unit 7) - Metal cladding top - 2023-04-14 - Pass.pdf.PDF
- [23 540268]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 8 (Block B Unit 8) - Metal cladding top - 2023-04-14 - Pass.pdf.PDF
- [23 540269]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 9 (Block B Unit 9) - Metal cladding top - 2023-04-14 - Pass.pdf.PDF
- [23 540270]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 6 (Block B Unit 6) - 2023-04-14 - Pass.pdf.PDF
- [23 540271]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 7 (Block B Unit 7) - 2023-04-14 - Pass.pdf.PDF
- [23 540272]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 8 (Block B Unit 8) - 2023-04-14 - Pass.pdf.PDF
- [23 540273]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 9 (Block B Unit 9) - 2023-04-14 - Pass.pdf.PDF
- [23 540276]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 15 (Block D Unit 15) - 2023-04-14 - Pass.pdf.PDF
- [23 540278]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 17 (Block D Unit 17) - 2023-04-14 - Pass.pdf.PDF
- [23 540279]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 18 (Block D Unit 18) - 2023-04-14 - Pass.pdf.PDF
- [23 540280]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 19 (Block D Unit 19) - 2023-04-14 - Pass.pdf.PDF
- [23 543871]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 11 (Block C Unit 11) - 2023-04-14 - Pass.pdf.PDF
- [23 621288]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 10 (Block C Unit 10) - 2023-04-26 - Pass.pdf.PDF
- [23 621289]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 11 (Block C Unit 11) - 2023-04-26 - Pass.pdf.PDF
- [23 621290]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 12 (Block C Unit 12) - 2023-04-26 - Pass.pdf.PDF
- [23 621291]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 13 (Block C Unit 13) - 2023-04-26 - Pass.pdf.PDF
- [23 621292]BCN20223177 - Inspection - 214 - Pre Plaster Exterior (Monolithic Cladding) - Unit 14 (Block C Unit 14) - 2023-04-26 - Pass.pdf.PDF
- [23 678137]BCN20223177 - Inspection - 217 - Pre Roof - Unit 1 (Block A Unit 1) - Main structure - 2023-05-04 - Pass.pdf.PDF
- [23 678139]BCN20223177 - Inspection - 253 - Pre Cladding - Unit 10 (Block C Unit 10) - Upper cladding - 2023-05-04 - Pass.pdf.PDF
- [23 678141]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 11 (Block C Unit 11) - 2023-05-04 - Pass.pdf.PDF
- [23 678143]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 13 (Block C Unit 13) - 2023-05-04 - Pass.pdf.PDF
- [23 678145]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 2 (Block A Unit 2) - 2023-05-04 - Pass.pdf.PDF
- [23 678146]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 3 (Block A Unit 3) - 2023-05-04 - Pass.pdf.PDF
- [23 678147]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 4 (Block A Unit 4) - 2023-05-04 - Pass.pdf.PDF
- [23 678149]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 5 (Block A Unit 5) - 2023-05-04 - Pass.pdf.PDF
- [23 713817]BCN20223177 - 28 Frederick St - Multi Tracking Spreadsheet.XLSX
- [23 735751]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 16 (Block D Unit 16) - Ceilings only - 2023-05-13 - Pass.pdf.PDF
- [23 735752]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 17 (Block D Unit 17) - Ceilings only - 2023-05-13 - Pass.pdf.PDF
- [23 735753]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 18 (Block D Unit 18) - Ceilings only - 2023-05-13 - Pass.pdf.PDF
- [23 735754]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 19 (Block D Unit 19) - Ceilings only - 2023-05-13 - Pass.pdf.PDF
- [23 735761]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 1 (Block A Unit 1) - 2023-05-13 - Pass.pdf.PDF
- [23 735762]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 2 (Block A Unit 2) - 2023-05-13 - Pass.pdf.PDF
- [23 735763]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 3 (Block A Unit 3) - 2023-05-13 - Pass.pdf.PDF
- [23 735764]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 4 (Block A Unit 4) - 2023-05-13 - Pass.pdf.PDF
- [23 735766]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 6 (Block B Unit 6) - 2023-05-13 - Pass.pdf.PDF
- [23 735767]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 7 (Block B Unit 7) - 2023-05-13 - Pass.pdf.PDF
- [23 735768]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 8 (Block BUnit 8) - 2023-05-13 - Pass.pdf.PDF
- [23 735769]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 9 (Block B Unit 9) - 2023-05-13 - Pass.pdf.PDF
- [23 735770]BCN20223177 - Inspection - Site Notice - 2023-05-13.pdf.PDF
- [23 779085]BCN20223177 Email Pre line B084 28-34 frederick st.MSG
- [23 779087]BCN20223177 Email -Bracing Minor variation - Engineering Frederick St.MSG
- [23 779097]BCN20223177 - Inspection - 900 - On Site Minor Variations - Unit 10 (Block C Unit 10) - 2023-05-20 - Pass.pdf.PDF
- [23 779098]BCN20223177 - Inspection - 900 - On Site Minor Variations - Unit 11 (Block C Unit 11) - 2023-05-20 - Pass.pdf.PDF
- [23 779099]BCN20223177 - Inspection - 900 - On Site Minor Variations - Unit 12 (Block C Unit 12) - 2023-05-20 - Pass.pdf.PDF
- [23 779100]BCN20223177 - Inspection - 900 - On Site Minor Variations - Unit 13 (Block C Unit 13) - 2023-05-20 - Pass.pdf.PDF
- [23 779101]BCN20223177 - Inspection - 900 - On Site Minor Variations - Unit 14 (Block C Unit 14) - 2023-05-20 - Pass.pdf.PDF
- [23 779102]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 16 (Block D Unit 16) - Walls - 2023-05-20 - Pass.pdf.PDF
- [23 779103]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 17 (Block D Unit 17) - Walls - 2023-05-20 - Pass.pdf.PDF
- [23 779104]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 18 (Block D Unit 18) - Walls - 2023-05-20 - Pass.pdf.PDF
- [23 779105]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 19 (Block D Unit 19) - Walls - 2023-05-20 - Pass.pdf.PDF
- [23 779106]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 13 (Block C Unit 13) - 2023-05-20 - Pass.pdf.PDF
- [23 779107]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 14 (Block C Unit 14) - 2023-05-20 - Pass.pdf.PDF
- [23 779108]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 15 (Block D Unit 15) - 2023-05-20 - Pass.pdf.PDF
- [23 779109]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 10 (Block C Unit 10) - 2023-05-20 - Pass.pdf.PDF
- [23 779110]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 11 (Block C Unit 11) - 2023-05-20 - Pass.pdf.PDF
- [23 779111]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 12 (Block C Unit 12) - 2023-05-20 - Pass.pdf.PDF
- [23 779112]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 13 (Block C Unit 13) - 2023-05-20 - Pass.pdf.PDF
- [23 779113]BCN20223177 - Inspection - Site Notice - 2023-05-20.pdf.PDF
- [23 823585]BCN20223177 - Inspection - 205 - Pre Line (Pre Line including Plumbing) - Unit 15 (Block D Unit 15) - 2023-05-27 - Pass.pdf.PDF
- [23 823586]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 1 (Block A Unit 1) - 2023-05-27 - Pass.pdf.PDF
- [23 823587]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 2 (Block A Unit 2) - 2023-05-27 - Pass.pdf.PDF
- [23 823589]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 4 (Block A Unit 4) - 2023-05-27 - Pass.pdf.PDF
- [23 823590]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 5 (Block A Unit 5) - 2023-05-27 - Pass.pdf.PDF
- [23 823591]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 6 (Block B Unit 6) - 2023-05-27 - Pass.pdf.PDF
- [23 823592]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 7 (Block B Unit 7) - 2023-05-27 - Pass.pdf.PDF
- [23 823593]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 8 (Block B Unit 8) - 2023-05-27 - Pass.pdf.PDF
- [23 823594]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 9 (Block B Unit 9) - 2023-05-27 - Pass.pdf.PDF
- [23 823595]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 10 (Block C Unit 10) - 2023-05-27 - Pass.pdf.PDF
- [23 823598]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 13 (Block C Unit 13) - 2023-05-27 - Pass.pdf.PDF
- [23 823599]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 16 (Block D Unit 16) - 2023-05-27 - Pass.pdf.PDF
- [23 823600]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 17 (Block D Unit 17) - 2023-05-27 - Pass.pdf.PDF
- [23 823602]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 19 (Block D Unit 19) - 2023-05-27 - Pass.pdf.PDF
- [23 823604]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 17 (Block D Unit 17) - 2023-05-27 - Pass.pdf.PDF
- [23 823605]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 18 (Block D Unit 18) - 2023-05-27 - Pass.pdf.PDF
- [23 932648]BCN20223177 - Removal of Section 77 Certificate - Request.MSG
- [23 932678]BCN20223177 - Removal of Section 77 Certificate - Agreement.MSG
- [23 942486]BCN20223177 - Inspection - 207 - Fire Resistant Lining - Unit 14 (Block C Unit 14) - 2023-06-16 - Pass.pdf.PDF
- [23 942489]BCN20223177 - Inspection - 209 - Pre Stop (Pre Stopping) - Unit 14 (Block C Unit 14) - 2023-06-16 - Pass.pdf.PDF
- [23 942492]BCN20223177 - Inspection - Site Notice - 2023-06-16.pdf.PDF
- [23 955474]BCN20223177 - Removal of Section 77 Certificate - Signed Certificate.PDF
Property Description
Please fill in the form below and we'll email you a link to download the PropertyFiles, instantly.
Terms of Supply
By accepting the information contained in this PropertyFile, I acknowledge I have read, understood and accepted the terms on which the information is made available.1. Where information is supplied by the agent to customers, the information is information in possession of the Vendor(s) that the Vendor(s) are making available to the customer without endorsement.
2. No representation is made by the agent or the Vendor(s) as to the accuracy, or to the reliability, of any information made available to the customers.
3. The customer will seek such advice and explanation the customer may require from an independent specialist of their choosing.
4. Should the purchaser decide not to obtain their own specialist advice, they are deemed to have satisfied themselves on all aspects of the property and are buying solely in reliance on their own judgement and contrary to the recommendation of the agent.
5. By registering you give consent to receive newsletters from the listing agent and/or PropertyFiles which you may unsubscribe from anytime.
Contact Rebecca Grose
Ray White Town & Lifestyle Ltd
Licensed REAA 2008
021 266 2173 rebecca.grose@raywhite.com All Listings